Hanford Site Resident Inspectors Activity Report for Week Ending July 31, 2026
August 21, 2026
August 21, 2026
WASHINGTON, Aug. 21 -- The Defense Nuclear Facilities Safety Board Resident Inspector in Hanford issued the following activity report for week ending July 31, 2026:
* * *
Hanford Site Resident Inspectors Activity Report for Week Ending July 31, 2026
Waste Encapsulation and Storage Facility: Resident inspectors (RIs) observed CPCCo personnel performing Universal Capsule Sleeve (UCS) loading operations. Workers loaded the UCS with cesium-137-bearing capsules . . .
* * *
Hanford Site Resident Inspectors Activity Report for Week Ending July 31, 2026
Waste Encapsulation and Storage Facility: Resident inspectors (RIs) observed CPCCo personnel performing Universal Capsule Sleeve (UCS) loading operations. Workers loaded the UCS with cesium-137-bearing capsules . . .