Construction Begins for the First-of-Its Kind, Cutting-Edge Sustainable Manufacturing Research Facility at UMaine
October 30, 2024
October 30, 2024
ORONO, Maine, Oct. 30 (TNSres) -- The University of Maine issued the following news release on Oct. 29, 2024:
The University of Maine broke ground today on the Green Engineering and Materials (GEM) building, a 50,000-square-foot facility designed to house the cutting-edge Factory of the Future (FoF) incorporating digital manufacturing technologies and fully adaptive, immersive learning spaces for students at UMaine and across the University of Maine System.
Scheduled f . . .
The University of Maine broke ground today on the Green Engineering and Materials (GEM) building, a 50,000-square-foot facility designed to house the cutting-edge Factory of the Future (FoF) incorporating digital manufacturing technologies and fully adaptive, immersive learning spaces for students at UMaine and across the University of Maine System.
Scheduled f . . .