Proton Power Upgrade reaches turning point, heads for finish line
May 07, 2024
May 07, 2024
OAK RIDGE, Tennessee, May 7 -- The U.S. Department of Energy's Oak Ridge National Laboratory issued the following news release:
For the past several months, the most visible component of the Proton Power Upgrade, or PPU, project for the Spallation Neutron Source, or SNS, at Oak Ridge National Laboratory was the construction of about 3,000 square feet of a curved concrete tunnel extension.
The new section of tunnel will provide the turning and connecting point for the a . . .
For the past several months, the most visible component of the Proton Power Upgrade, or PPU, project for the Spallation Neutron Source, or SNS, at Oak Ridge National Laboratory was the construction of about 3,000 square feet of a curved concrete tunnel extension.
The new section of tunnel will provide the turning and connecting point for the a . . .