NRC Receives Event Notification Involving Brunswick Power Reactor in North Carolina
July 04, 2019
July 04, 2019
WASHINGTON, July 4 -- The Nuclear Regulatory Commission issued the following event notification (No. 54144) involving the Brunswick power reactor in North Carolina:
60 DAY OPTIONAL NOTIFICATION DUE TO ACTUATION OF AN EMERGENCY DIESEL GENERATOR
"This 60-day optional telephone notification is being made in lieu of an LER submittal, as allowed by 10 CFR 50.73(a)(1). This notification is made pursuant to the reporting requirements specified in 10 CFR 50.73(a)(2)(iv)(A) . . .
60 DAY OPTIONAL NOTIFICATION DUE TO ACTUATION OF AN EMERGENCY DIESEL GENERATOR
"This 60-day optional telephone notification is being made in lieu of an LER submittal, as allowed by 10 CFR 50.73(a)(1). This notification is made pursuant to the reporting requirements specified in 10 CFR 50.73(a)(2)(iv)(A) . . .