New Cycle and Pedestrian Crossing Links Up Woodston and Botolph Green
September 02, 2010
September 02, 2010
PETERBOROUGH, England, Sept. 2 -- The Peterborough City Council issued the following news release:
Work to create a rail crossing which will connect the Sugar Way development with Botolph Green will begin in September 2010.
The new Western Link will allow cyclists and pedestrians to cross both the main route of the Nene Valley Railway and Fletton branch line by connecting the footpath and cycleway from Driffield Way on the Sugar Way development with the footpath an . . .
Work to create a rail crossing which will connect the Sugar Way development with Botolph Green will begin in September 2010.
The new Western Link will allow cyclists and pedestrians to cross both the main route of the Nene Valley Railway and Fletton branch line by connecting the footpath and cycleway from Driffield Way on the Sugar Way development with the footpath an . . .
