NRC Receives Event Notification on Blind Sample Returned With Inaccurate Result
August 16, 2017
August 16, 2017
WASHINGTON, Aug. 16 -- The Nuclear Regulatory Commission issued the following event notification (52908) involving River Bend nuclear plant, La.:
FITNESS FOR DUTY - BLIND SAMPLE RETURNED WITH INACCURATE RESULTS
"A blind sample provided from an independent laboratory to fleet testing facility was returned with inaccurate results. This is in violation of 10 CFR 26.719(c)(3) and requires a 24-hour report."
The licensee has notified the NRC Resident . . .
FITNESS FOR DUTY - BLIND SAMPLE RETURNED WITH INACCURATE RESULTS
"A blind sample provided from an independent laboratory to fleet testing facility was returned with inaccurate results. This is in violation of 10 CFR 26.719(c)(3) and requires a 24-hour report."
The licensee has notified the NRC Resident . . .